House extensions in London: types, costs and planning
Rear, side and multi-storey options. Scope, costs and sequencing planned early. Designed, approved and built by Suddeco.
Indicative render, confirmed on surveyWhy Suddeco
Layouts shaped by real plots
Choose a layout that suits the plot, the structure and the way you live.
Old and new join properly
Plan utilities, drainage and structural openings before they become snags.
Sequencing kept under control
Keep materials, trades and finish stages moving in the right order.
See real layouts first
Existing and proposed plans for your type of house. Pick one and add your address.
Existing ground floor
Proposed ground floor

Render (illustrates the type)
Extra space planned around the property you have
When the house feels short on space, moving is not the only answer. We build house extensions that add room for kitchens, dining, work or family life while linking properly with the existing property. Rear, side, wraparound and multi-storey options each suit different plots and structural setups, so the right choice starts with the space you need and what the site can take. With Suddeco, the early work covers drawings, site conditions, quantities and likely costs, so the extension is planned as a real build, not just a hopeful sketch.
The awkward details sorted before they bite
The awkward bits are usually the ones that matter most: access, drainage, utilities, structural openings and how old and new areas meet without looking like strangers. We organise the scope, materials and programme around those practical points, then coordinate the work packages through delivery. Choosing Suddeco means your extension planning stays connected to project management as well as the hands-on build, which helps keep structural work, services and finishes moving in the right order.
What does it cost in London?
Ranges, what is included and what adds cost.
Rear, side return, wrap-around or double storey
What each shape is for, and the rate our own guides publish for it. Two of the five have a cost guide of their own; the calculator carries the rest.
| Type | What it is | Rate we publish per m² | Read more |
|---|---|---|---|
| Rear extension | Extends straight back from the rear wall. The most common shape and the simplest structure. | £1,800–£2,800 | Rear extension cost per m² |
| Side return | Fills the narrow alley beside the kitchen on a Victorian or Edwardian terrace, usually alongside a rear extension. | £2,000–£3,000 | Side return extension cost |
| Wrap-around | A rear extension plus a side return, wrapping around the back corner of the house. | £2,000–£3,000 | Extension cost calculator guide |
| Double storey | Ground and first floors extended together. A lower rate per square metre over a much larger total. | £1,800–£2,500 | Extension cost calculator guide |
| L-shaped | A footprint shape rather than a separate product: a rear extension with a leg down one side, which is what a wrap-around creates. We publish no separate L-shaped rate. | £2,000–£3,000 (wrap-around rate) | Extension cost calculator guide |
These are the rates our published guides carry. Our rear extension guide treats them as including VAT at 20%; the extension cost calculator guide carries the same low and high rates as construction before VAT, fees and contingency. Check which basis a builder’s quote uses before comparing.
What a London extension costs in 2026
Published rates and worked examples from our own guides, then the professional fees that sit on top of a builder’s price.
| London rate or example | Published figure | Basis |
|---|---|---|
| Rear extension, London Zones 1–3 | £2,500–£3,500 per m² (+30–50% on the national rate) | Construction, inc. VAT |
| Rear extension, outer London | £2,300–£3,200 per m² (+20–30%) | Construction, inc. VAT |
| Rear extension, London | £3,000–£4,500 per m² | All-in, including fees and contingency |
| Side return, London | £2,500–£3,500 per m²; a 12 m² project £32,000–£45,000 | Construction, inc. VAT |
| Single-storey rear, 20 m², London, standard finish | about £47,000–£84,000 | Calculator output, before VAT and fees |
What the same floor areas are published at
| Type and total floor area | Published build cost | Basis |
|---|---|---|
| Single-storey rear, 20 m² | £36,000–£56,000 | Construction only |
| Side return, 15 m² | £30,000–£45,000 | Construction only |
| Wrap-around, 25 m² | £50,000–£75,000 | Construction only |
| Double storey, 40 m² | £72,000–£100,000 | Construction only |
| Kitchen extension, 20 m² | £40,000–£60,000 | Construction only |
| Rear extension, 20 m², all-in | budget £41,000–£50,000; mid-range £50,000–£61,000; premium £61,000–£74,000 | All-in, including VAT, fees and 10% contingency |
Professional and statutory fees
| Fee | Published figure |
|---|---|
| Planning application, householder | £548; the council's own schedule governs, so check before you pay |
| Building regulations approval | £200–£1,000; a typical 25 m² extension is £500–£800 on the local authority route and £600–£1,000 in London |
| Party wall surveyor | £700–£2,000 with one agreed surveyor; £2,000–£4,000 if each side appoints; £1,500–£2,500 for a London side return or wrap-around |
| Structural engineer | £500–£2,000 |
| Architect or designer | 5–10% of build cost: £3,750–£7,500 on a typical £75,000 extension |
| Contingency | 10–15% of the build cost |
Build costs above are construction only unless the basis column says all-in. VAT at 20%, professional fees, statutory fees and a contingency are added on top of construction costs, which our rear extension guide puts at £300–£500 for every £1,000 of construction. A written scope and itemised quote is the only figure you should treat as yours.
Frequently asked
What type of extension might suit our property?
That depends on the plot, the space you need, the existing structure and how the new area needs to connect to the house. Rear, side, wraparound and larger multi-storey options all solve different problems, so the right answer comes from the property rather than fashion.
Can we stay in the house during extension work?
Many people do, but it depends on the scale of structural work, the services affected and how the old and new spaces connect during construction. Early planning for access, protection and sequencing makes it much easier to judge what living arrangements are sensible.
What should we send at the enquiry stage?
Drawings are the best start if you have them. It also helps to know the address, what extra space you want, any known access issues and anything awkward such as drainage runs or utility positions. That gives the planning and costing discussion something solid to work from.
Does Suddeco do the building work itself?
Yes — all of it. Suddeco designs, handles planning and delivers the build with its own project management.
How much does a house extension cost per square metre in London?
Our rear extension guide publishes £2,500–£3,500 per m² for construction in London Zones 1–3 and £2,300–£3,200 in outer London, against a UK average of £1,800–£2,800. All-in, with fees, VAT and contingency, it puts a London rear extension at £3,000–£4,500 per m². Our side return guide publishes £2,500–£3,500 per m² for London, with a 12 m² project at £32,000–£45,000.
Do I need planning permission for an extension?
Often not, for a single-storey rear extension that stays inside the limits our rear extension guide sets out: single storey, no more than 3 m beyond the original rear wall (4 m on a detached house), maximum 4 m high, materials similar to the existing house, and not on designated land such as a conservation area. Beyond those limits, or in a conservation area, you need householder planning permission. Our planning guide covers the application and its £548 fee, and your council confirms the position for your address.
How long does an extension take?
Our side return guide publishes 8–12 weeks on site, plus 4–8 weeks for design and preparation and 8–12 weeks for planning permission if it is needed, so 4–7 months from design to completion for that type. Standard householder applications should be decided within 8 weeks, though 8–12 weeks is the realistic expectation. We confirm a programme for your property at the survey.
Do I need a party wall agreement?
Usually, for a side return or wrap-around. If the work is within 3 m of a neighbour's foundations it falls under the Party Wall etc. Act 1996. Budget £700–£2,000 with one agreed surveyor, or £2,000–£4,000 if each side appoints its own; our party wall guide puts a London side return or wrap-around at £1,500–£2,500 for an agreed surveyor. A party structure notice is due at least two months before work starts.
Do I need an architect for an extension?
Not always, but most extensions need a designer for the drawings and the planning or building regulations work. Our architect fees guide publishes 5–10% of build cost, which is £3,750–£7,500 on a typical £75,000 extension, with fixed-fee routes from about £2,500. Our Design + Planning package covers the application, building regulations and structural engineering for a fixed fee.
What is a side return extension?
It is the narrow strip beside the kitchen in a Victorian or Edwardian terraced house, filled in to widen the kitchen and connect it to the garden. Side returns are small, typically 10–15 m², but structurally demanding, because the rear wall comes out and steel goes in. Our side return guide publishes £2,000–£3,000 per m² and £22,000–£45,000 all-in for 10–15 m².
What are the permitted development limits for an extension?
For a house in England, Schedule 2 Part 1 Class A of the General Permitted Development Order 2015 allows a single-storey rear extension up to 3 m deep (4 m on a detached house), up to 4 m high, in similar materials, with no more than half the garden covered and nothing built forward of the principal elevation. Deeper single-storey extensions, up to 6 m (8 m if detached), need prior approval from the council. Flats, listed buildings and much of designated land, including many conservation areas, are outside these rights, so confirm the position for your address with your council.
How do we keep the build affordable?
The list in our rear extension guide is the one we would give you: keep the footprint a simple rectangle, use standard materials, avoid removing load-bearing walls, and fix the design before work starts so variations do not pile up. It also puts a 5–10% labour saving on building in autumn or winter, when builders are quieter, and the side return guide points to a roof lantern instead of a full glass roof as one of the biggest avoidable costs.
Price it, then plan it
Start with the calculator for a London range built from our published rates, then book a free survey to confirm scope, access and structure for your property.
Talk to us about your project
Send us your project and we will be in touch.
House extensions across London
We design, gain approval for and build in every London borough.